Are there any construction or renovation works at this Egypt beach resort, and which buildings are affected?
From messages by 4 participants in 1 source · Last activity: 7 days ago
From messages by 4 participants in 1 source · Last activity: 7 days ago
TL;DR
Recent reports indicate that occupied buildings are operating without obvious renovation. An unfinished building stands beside blocks 12 and 13, while the beach restaurant and some beach facilities are being renovated slowly.
A recent guest was assigned room 8135 in a building by the beach area, close to the transport stop. This suggests that rooms near the beach are still being used for guests.
Guests reported no visible active renovation in the occupied buildings; the blocks appeared to be open and inhabited.
An unfinished building is located beside blocks 12 and 13. Reports say no work was taking place there, so it appears to be an inactive abandoned construction site rather than an active project.
Slow renovation work is underway at the beach restaurant and possibly other beach facilities. Travelers should allow for possible limited access or construction views in that part of the resort.